Consultation commenced: 3 November 2025
Second-round consultation commenced: 11 May 2026
Final documents published: 10 September 2026
Date of effect: 19 October 2026
The Northern Territory Electricity System and Market Operator (NTESMO) has completed its consultation on the development and amendment of the Scheduling and Dispatch Guideline and System Control Plant Outage Procedure for the Darwin-Katherine Power System.
The consultation was undertaken to improve the clarity and usability of the scheduling, dispatch and outage planning framework, align the documents with current operational practices, and support the ongoing development of the Territory electricity market.
The consultation was undertaken in two rounds. The first round sought stakeholder feedback on the proposed changes. Following consideration of first-round submissions, NTESMO published its responses and amended draft documents for a second round of consultation. NTESMO has now considered the second-round submissions and finalised both documents.
The final documents and consultation outcomes are provided below. Links to the earlier stages of consultation are also provided to maintain access to the complete consultation record without duplicating previously published material.
Second-round submissions were received from Territory Generation and Assure Energy NT and addressed matters relating to both the Scheduling and Dispatch Guideline and the System Control Plant Outage Procedure.
Full details of the matters raised during the second round, NTESMO's responses and commentary, and the resulting consultation outcomes are provided in the Second-round Submissions, NTESMO Responses and Final Consultation Outcomes report.
The following documents represent the final outcomes of this consultation:
Accessibility notice: Market participant submissions are published as received and may not meet WCAG 2.1 accessibility standards. If you require assistance accessing this information, please contact the Market Operator Team at market.operator@powerwater.com.au.
The final Scheduling and Dispatch Guideline and System Control Plant Outage Procedure take effect from 19 October 2026.
Publication of the final documents, NTESMO's responses to second-round submissions and the final consultation outcomes completes this consultation.
The earlier consultation stages and previously published documents remain available through the following closed consultation pages:
This page contains NTESMO's responses to first-round submissions, the amended draft documents published for the second round of consultation, and the associated consultation material.
Notice of consultation - NTESMO Scheduling and Dispatch Procedure development | NTESMO
This page contains the initial consultation notice, discussion paper, draft consultation documents and first-round consultation material.