Non-Reliable Risk Notices

Non-Reliable Notices are issued based on generation shortfall in meeting the forecasted demand and also the inability to maintain sufficient responsive supply reserves to meet credible contingency events.

In reference to clauses 3.7.1 and 3.7.2 of the System Control Technical Code, System Control issues Non-Reliable Notices to meet its obligation to notify participants of the estimated period of the Lack of Stand-by generation, the estimated generation shortfall value, and its estimated time of occurrence, at the time the declaration is made.

Table 1 below summarises active Non-Reliable Notices, which affect system participants in the Darwin-Katherine, Tennant Creek, and Alice Springs Power Systems.

Table 2 below summarises historical Non-Reliable Notices that have either expired or been cancelled based on the forecasted demand and the available generation.

The following terminology has been used:

Note: A declaration of LOS2 automatically indicates an LOS1 situation, while a declaration of LOS3 automatically indicates both LOS1 and LOS2 situations. This is not applicable  for ASPS as only LOS2 and LOS3 situations applies.

For more information on the information presented below please Contact SCOperationsPlanning.PWC@powerwater.com.au.

Table 1: Active Non-Reliable Notices

Region NRN ID Commencement Date and Time Anticipated End Date  and Time LOS Condition NRN Description
DKPS251008428/10/202530/10/2025LOS2

As a result of forced outages, planned outage, and forced restriction, a NRN for LOS1 & LOS2 will be in effect  approximately between the
hours of 15:00  to 21:30 in the DKPS.
Note: This NRN is issued based on forecasted load conditions (i.e. LOS1/LOS2 applicability is system load‑dependent).

       

Table 2: Historical Non-Reliable Notices

Region NRN ID Commencement Date and Time Anticipated End Date and Time LOS Condition NRN Description
DKPS251007927/10/202528/10/2025LOS2

As a result of forced outages, planned outage, and forced restriction, a Non-Reliable Notice (NRN) for Lack of Standby Reserve  2 (LOS2) will be in effect from 27/10/2025 to 27/10/20256 , approximately between the hours of 15:00 to 21:00 in the Darwin - Katherine Power System (DKPS).

Note: This NRN will be rescinded once W3 and C6 are back in service, provided there are no further unplanned outages.

DKPS251006420/10/202526/10/2025LOS2

As a result of forced outages, planned outage, and forced restriction, a Non-Reliable Notice (NRN) for Lack of Standby Reserve 1 & 2 (LOS1 & LOS2) will be in effect from 20/10/2025 to 26/10/20256 , approximately between the hours of 15:00 to 21:00 in the Darwin - Katherine Power System (DKPS).

Note: This NRN will be rescinded once W3 is back in service, provided there are no further unplanned outages.

 
ASPS251007021/10/202521/10/2025LOS2As a result of forced outages, and planned outages, a Non-Reliable Notice in the Alice Spring Power System (ASPS) for Lack of Standby Reserve 2 (LOS2) is in effect on 21/10/2025, approximately between the hours of 16:30 to 18:45. 
ASPS251005316/10/202520/10/2025LOS2

As a result of forced outages, and planned outages, a Non-Reliable Notice in the Alice Spring Power System 
(ASPS) is in effect from 16/10/2025 to 20/10/2025, approximately between the hours of 12:00 to 21:00. 
This notice is issued based on forecasted load conditions.

 
DKPS251005717/10/202519/10/2025LOS3As a result of forced outages, planned outage, and forced restriction, a NRN for LOS1, LOS2 and LOS3 is in effect
on 17/10/2025, approximately between the hours of 14:30 to 21:30 in the Darwin-Katherine region. 

A NRN for LOS1 and LOS2 will be in effect on 18/10/2025 and 19/10/2025,
approximately between the hours of 15:00 to 21:30 in the Darwin-Katherine region.
 
DKPS251004814/10/202516/10/2025LOS1As a result of forced outages, planned outage, and forced restriction, a NRN is in effect on 14/10/2025 and 16/10/2025, approximately between the hours of 16:00 to 21:00 in the DKPS. This notice is issued based on forecasted load conditions. 
ASPS251004513/10/202516/10/2025LOS2As a result of Planned outages, forced outages and restricted generation output, a Non-Reliable Notice is in effect from 13/10/2025 until 15/10/2025, approximately between the hours of 16:30 to 19:00 in the ASPS.
This notice is issued based on forecasted load conditions.
 
DKPS251004213/10/202513/10/2025LOS2As a result of forced outages, planned outage, and forced restriction, a NRN is in effect on 13/10/2025, approximately between the 
hours of 12:30 to 20:30 in the DKPS. This notice is issued based on forecasted load conditions.
 
Alice Springs251001907/10/202507/10/2025LOS2As a result of Planned outages, forced outages and restricted generation output, a Non-Reliable Notice is in effect on 10/03/2025, approximately between the hours of 15:00 and 20:00 in the ASPS.
Note: ASPS is currently operating in a non-secure state due to a planned outage on Owen Springs Unit 3 (for further details, refer to OTR 2510003).
 
Darwin-KatherineN/A05/10/202505/10/2025LOS2

As a result of forced outages, planned generation maintenance, and restricted generation output, the DKPS operated in a Non-Reliable state on 05/10/2025 due to LOS2 between approximately 18:00 and 19:30 hours, and LOS1 between 16:30 and 19:30 hours.

Note: No NRN was issued for this event.

Darwin-KatherineN/A04/10/202504/10/2025LOS2

As a result of forced outages, planned generation maintenance, and restricted generation output, the DKPS operated in a Non-Reliable state on 04/10/2025 due to LOS2 between approximately 17:00 and 18:30 hours, and LOS1 between 16:30 and 20:00 hours.

Note: No NRN was issued for this event.

Darwin-Katherine250905916/09/202516/09/2025LOS2As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice is in effect on 16/09/2025, approximately between the hours of 17:30 and 21:00 in the DKPS.
Darwin250809228/08/202529/08/2025LOS2As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice is in effect on on 28/08/2025 to 29/08/2025, approximately between the hours of 21:30 and 05:30 in the Darwin Power System.
Darwin250809028/08/202528/08/2025LOS1As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice is in effect on on 28/08/2025, approximately between the hours of 17:30 and 19:30 in the Darwin Power System.
Darwin-Katherine250607126/06/202526/06/2025LOS2As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice is in effect on 26/06/2025, approximately between the hours of 16:30 and 21:00 in the DKPS.
Darwin-KatherineN/A17/06/202517/06/2025LOS2As a result of forced outages, planned generation maintenance, and restricted generation output, DKPS was in a  Non-Reliable state on 17/06/2025, approximately between the hours of 16:30 to 19:30.
Darwin-Katherine250507114/05/202515/05/2025LOS1As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice was in effect from 14/05/2025 to 15/05/2025, approximately between the hours of 16:30 and 20:00 in the DKPS.
Darwin-Katherine250307417/03/202517/03/2025LOS2As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice was in effect on 17/03/2025, approximately between the hours of 15:30 to 20:00 in the DKPS.
Alice Springs250303910/03/202514/03/2025LOS2As a result of forced outages and restricted generation output, a Non-Reliable Notice will be in effect from 10/03/2025 to 14/03/2025, approximately between the hours of 15:00 and 19:30 in the Alice Spring Power System (ASPS).
Darwin-Katherine250305112/03/202513/03/2025LOS2As a result of forced outages and planned outage, a Non-Reliable Notice will be in effect from 12/03/2025 to 13/03/2025, approximately between the hours of 17:00 and 19:30 in the Darwin - Katherine Power System (DKPS)
Darwin-Katherine250302205/03/202506/03/2025LOS2As a result of forced outages and planned outage, a Non-Reliable Notice will be in effect from 05/03/2025 to 06/03/2025, approximately between the hours of 14:30 and 21:00 in the Darwin - Katherine Power System (DKPS)
Alice Springs250300503/03/202504/03/2025LOS2As a result of forced outages and restricted generation output, a Non-Reliable Notice will be in effect from 03/03/2025 to 04/03/2025, approximately between the hours of 14:00 and 21:00 in the Alice Spring Power System (ASPS).
Alice Springs250208613/02/202513/02/2025LOS2

As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice will be in effect on 13/02/2025 between the hours of 15:30 to 20:30 in the Alice Spring Power System (ASPS).

Alice Springs250205010/02/202512/02/2025LOS2

As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice will be in effect from 10/02/2025 to 12/02/2025 between the hours of 13:30 to 20:30 in the Alice Spring Power System (ASPS).

Alice Springs250204507/02/202509/02/2025LOS2

As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice will be in effect from 07/02/2025 to 09/02/2025 between the hours of 16:00 to 19:00 in the Alice Spring Power System (ASPS).

Alice Springs250112031/01/202502/02/2025LOS2

As a result of forced outages and restricted generation output, a Non-Reliable Notice will be in effect from 31/01/2025 to 02/02/2025 between the hours of 13:30 to 22:00 in the Alice Spring Power System (ASPS).

Alice Springs2501106

28/01/2025

29/01/2025LOS2

As a result of forced outages and restricted generation output, a Non-Reliable Notice will be in effect on 28/01/2025 and 29/01/2025 between the hours of 14:00 to 20:00 in the Alice Spring Power System (ASPS).

Alice Springs250104514/01/202514/01/2025LOS2

As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice will be in effect on 14/01/2025 between the hours of 16:00 to 20:00 in the Alice Spring Power System (ASPS).

Darwin-Katherine241203011/12/202411/12/2024LOS2As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice was in effect on 11/12/2024, approximately between the hours of 16:00 to 21:00 in the DKIS.
Darwin-Katherine2409079 - V201/10/202402/10/2024LOS2As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice was in effect from 01/10/2024 to 02/10/2024, approximately between the hours of 15:30 to 21:00 in the DKIS.
Darwin-Katherine2409079 - V130/09/202401/10/2024LOS1As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice was in effect from 30/09/2024 to 01/10/2024, approximately between the hours of 17:00 to 20:00 in the DKIS.
Darwin-Katherine240811929/08/202430/08/2024LOS1As a result of forced outages, planned generation maintenance, and restricted generation output, a Non-Reliable Notice was in effect from 29/08/2024 to 30/08/2024, approximately between the hours of 16:30 to 21:00 in the DKIS.