Final report - NTESMO Amendment of the Secure System Guidelines – System Frequency Control

Date of notice: 12 September 2025

This Notice of Expedited Rules Consultation (Notice) informs all relevant parties including:

The Consultation is being conducted under clause S3.5.2 of the System Control Technical Code, Version 7.0, 14 February 2024 , consistent with the expedited rules consultation procedure presented in the National Electricity Rules as in force in the Northern Territory – v125 – Chapter 8.9.3 .

The amendments to the Secure Systems Guideline (SSG) include the following:

A set of discussion papers that further explain amendments regarding frequency control, including:

  • Reformatting of the SSG to align with the formatting of the System Control Technical Code (SCTC) and other procedures and guidelines.
  • A discussion paper responding to all written submissions received during the consultation process.
  • Final reference materials for licensed generator participants and the UC specific to accreditation examples for generators.

Matters under consultation

The changes (Changes) proposed (Proposal) are to:

  • Reformat the SSG consistent with the format of the SCTC, update all cross references, and structure the SSG into themed sections:
    • Guidelines for System Frequency
    • Guidelines for System Adequacy
    • Guidelines for System Voltage
    • Guidelines for Power System Operations
    • Registration Thresholds
    • Related Records
    • Document History
  • Amend the Guidelines for System Frequency to include:
    • Operational Application of Frequency Operating Standards
    • Frequency Control Ancillary Services (FCAS) and their application

Consultation outcome

The consultation process is now complete. SSG version 5 will take effect on 1 November 2025.

NTESMO thanks participants and interested parties for their written submissions. NTESMO has made final amendments to the SSG version  5 that align with recommendations received during the consultation process.

The following documents are available for reference:

NTESMO proposed changes to secure system guidelines - final amendments PDF, 325.72 KB

Read NTESMO’s response to Territory Generation’s submission on proposed amendments to the Secure System Guidelines (SSG).

NTESMO Secure System Guidelines Version 5 PDF, 750.55 KB

Read version 5 of the Secure System Guidelines, outlining principles for maintaining power system stability and reliability.