Indigenous Essential Services Deemed Load Profile

These documents bring to the attention of market participants, the Market Operator’s intention to use a deemed load profile as one element in determining Jacana Energy’s non-interval meter consumption, and for determining the total IES load at the Transaction Reference Point (TRP). The quantities for these market participants will be determined on a trading interval basis. This document fulfils a requirement in the pending System Control Technical Code for the Market Operator to consult with electricity market stakeholders on a suitable algorithm.

  1. Consultation Impact Statement – IES Deemed Load Profile Proposal PDF, 50.92 KB
  2. Circulated IES Deemed Load Profile PDF, 164.33 KB
  3. Submissions received from market participants:
    1. Jacana Energy PDF, 4514 KB
    2. Territory Generation PDF, 38.01 KB
  4. Market Operator consultation response to submissions PDF, 136.63 KB
  5. Approved - Indigenous Essential Services Deemed Load Profile PDF, 164.33 KB